Available Contract Packages
- Site preparation & earthwork
- Concrete foundations & slabs
- Structural steel
- High-voltage electrical (34.5 kV feeds)
- Medium-voltage distribution
- Generator & UPS installation
- Chilled water plant & CRAC units
- Dry cooler installation
- Fire suppression (NOVEC/clean agent)
- Security & access control
- Roofing & envelope
- More packages added weekly — register to stay ahead.

Win Contracts on the Monticello, Minnesota Hyperscale Data Center Project
Two 75–150 MW hyperscale data centers are under development in Monticello, MN by a Fortune-50 tech giant (Google or Microsoft). Over $1 billion in construction spend is coming 2026–2028. Register below to get on the early bidder list and receive RFPs the moment they drop.
Project Snapshot: Monticello Data Center (2026–2028)
- Total project value: $1–1.5 billion
- Phase 1 groundbreaking: Expected Q2–Q3 2026
- Peak workforce: 1,200–1,800 construction workers
- Key trades needed: Electrical, HVAC, plumbing/pipefitting, civil/site work, low-voltage/security, fire suppression, concrete, steel erection
How to get an early bid and be notified:
Fill out the form below → we send your company info directly to the project team and prime GC the moment bid packages are released.
Why Register Early?
Most prime contractors lock their short-list of subcontractors 6–12 months before the first shovel hits the ground. By the time the official bid ads go out, the real money packages are already spoken for.
- You get added to the early bidder list that primes and the owner’s rep actually use (not the public one they post on some random plan room 90 days before NTP).
- Invite-only packages (the $30M–$150M electrical, generator, chiller plant, and NOVEC scopes) are awarded from this list—many never see a public RFP.
- Early registrants get the pre-qualification packet and bonding requirements 4–8 weeks before everyone else—giving you time to line up surety letters and teaming partners while your competitors are still scrambling.
- The first 50 qualified firms in each major trade get direct intros to the short-listed CM/GC teams (we’ve already seen it happen on every Midwest hyperscale project the last 3 years).

FAQ
- When does construction start? → Expected Q2–Q3 2026
- Who is the owner/developer? → Confidential hyperscaler (Google or Microsoft rumored)
- Who is the GC? → Not yet announced (register for updates)
- Is prevailing wage required? → Yes — Minnesota prevailing wage rates apply